Vietnam Thai An Hydropower Station
Thai An Hydropower Station locates in the middle-downstream of Mien River, which is a tributary of Lo River, northeast of Tinh Ha Giang, 34km from the provincial capital of Tinh Ha Giang. The catchment above the dam site reaches 1494 km², 890 km² of which within Chinese territory. This Station is the biggest in install capacity of hydropower designing project ever accomplished overseas by HRC/company. Designed rated head of the Station is 186m, installed capacity is 2*50MW. The station was connected to the gird in Dec. 2010.


 