Mongolia Taishir Hydropower Station |
Mongolia Taishir Hydropower Station locates on the ZABKAN river which lies in the junction of GOBI ALTAI province and ZABKAN province (about 1050km west from Ulan Bator), installed capacity of the station is 3*3.45MW 1*650kW. Rated head of 3.45MW set is 43.80m, for the 650kW set 35.20m. The station was connected to the grid in Oct. 2010. |