Fax:86 571 8806 2934
Phone:86 571 8808 6586
Address:122 Xueyuan Road, Hangzhou, China
postcode:310012
[Email us]
Address at the Inaugural Ceremony of SHP Special Committee of China Society of Hydroelectric Engineering

Mr. Hu Siyi, Vice minister of Ministry of Water Resources
£¨2008.12.15£©

   ---Dear Committee Members£¬distinguished guests:

Good morning!
   It is especially of great importance to hold the inauguration of the SHP Special Committee of China Society of Hydroelectric Engineering today, at the important 30th anniversary of China's reform and opening-up and against the backdrop of the activity of "study and practice the Scientific Outlook on Development" carried out in the nationwide water sector to promote the development and reform of water resources undertaking. I hereby would like to avail myself of this opportunity, on behalf of the Chinese Ministry of Water Resources, to express my warm congratulations on the establishment of SHP Special Committee and to extend my greetings to all the participants here.

   Hydro-energy resources is a clean and renewable energy, rural hydropower constitutes an important part of the rural infrastructure and people's livelihood water resources. With the support of the state policies, governments at various levels together with the masses have carried forward the spirit of self-reliance and hard struggle and vigorously exploited the abundant local hydropower resources. In total, over 40,000 rural hydropower stations have been erected nationwide with a total installed capacity of over 50 million kW and an annual generation of over 150 billion kWh, which had accumulatively solved the electricity problem for 0.3 billion rural people not accessible to electricity, Electricity supply in 1/3 of China's counties mainly relies on rural hydropower. Recent years have seen the construction of 653 rural hydropower based primary electrified counties and,409 rural hydropower based electrified counties. The development of rural hydropower of those old revolutionary, minority nationality, remote and poverty-stricken areas in the central and western regions has speeded up the development of the social- economy as well as brought a dramatic change in people's life and mental attitude. The pilot project and its expansion of "Replacing Firewood with SHP" since 2003 have made great headway. Leaders of the State Council evaluated highly of the project, which not only scores economic, social and ecological benefits, but also is an effective way to solve the issues of the "agriculture, farmers and rural areas". It is worthy to mention that rural hydropower, which features decentralized and "small, quick, flexible" , has played an unique role in recovering power supply, guaranteeing the grid safety, effectively reducing the damage and promoting the diversification of regional power supply after the unexpected low temperature, rainy snowing and freezing disaster and May 12th Wenchuan seism in upper half of this year.

   Standing at the new start of history, the rural hydropower is now embracing a precious opportunity for its development. First of all, the Central Committee of CPC and the State Council both attach great importance to the rural hydropower development and regard it as part of the important rural infrastructure. At the third plenum of 17th Central Committee of Communist Party of China which just closed up, it is required that we should step up efforts to enhance infrastructure construction, increase power supply in rural areas and improve people's living as well as productive and living conditions. Secondly, in order to apply the Scientific Outlook on Development and promote the sustainable social and economic development, the central government has geared up energy-saving, emission-reduction, optimization of energy supply structure and the development of clean and renewable energy. In addition, to counteract the international financial crisis, the state has issued a series of policies to expand domestic consumption and considerably increase the input in the water sector. For implementing the strategies of the Central Committee and the State Council, the Ministry of Water Resources has made it major work to develop livelihood related water engineering including rural hydropower development. It is required to increase investment in rural hydropower development ,and fully implement Planning of the Project of Replacing Firewood with SHP from 2009 to 2015 ,continue to promote the construction of the hydropower based rural electrification.

   In recent years, China's rural hydropower development witnesses an unprecedented progress. However, it still faced many contradictions and problems caused by the profound change of construction and management environment. In some places, due to the weak management, delayed planning and lack of corresponding laws and regulations, problems of different degrees still exist, such as the seizure of hydropower resources, disordered development, environment degradation and deviation from farmers' benefits, drawing great concern of the society. There are also other problems impacting the sustainable development of rural hydropower, like the management system, investment mechanism, integration to grid, pricing, taxation and technological innovation. Nowadays, ecological and environmental protection has been a factor that constrains the rural hydropower development. Therefore, it is required that we step up efforts in environmental protection while developing the rural hydropower and to coordinate well the relationship between hydropower development and environmental protection, minimize the negative impacts and maintain the sound condition of the rivers.

   Confronted with both new opportunity and challenge, it is necessary to insist on taking the Scientific Outlook on Development as our guidance and give overall consideration to farmers' benefits, local development, environmental protection and ecological construction, taking the road of scientific, orderly and sustainable development. We should strengthen hydropower resources management, implementing the system of paid utilization of hydropower resources and its marketing allocation. Moreover, we should reinforce safety supervision strictly, follow the capital construction procedures and tighten the engineering quality management. We should increase the investment in rural hydropower development, accelerate the project of "Replacing Firewood with SHP" and the construction of hydropower based rural electrification. It is also required to enforce the legal construction, for providing legal protection for rural hydropower development; promote the technological advancement, improve the system of technical standards and popularize the advanced technology and management experience, push the modernization of rural hydropower.

   Academic society is the bridge and connection between the government as well as the Party and the massive technical professionals. The SHP Special Committee gathers the technical and management elites in the rural hydropower sector, which takes non-replicable professional advantage over other institutions and organizations. It will play a vital role in the rural hydropower development, especially in policy research, technical advancement, experience exchange and personnel training. I would like to take this opportunity to give some advices and requirements to the committee:

   First, be a good consultant. SHP Special Committee's work should put importance round central tasks and serve for overall situation, in combination closely with people's livelihood water work. Consolidate the research of key issues with impact on overall situation and important issues of social broad concern in accordance with the new changes and characteristics of rural hydropower development. Be a good consultant for the scientific development of small hydropower..

   Second, attach importance to technical innovation. Rural hydropower has wide coverage, strong specialization and complicated technology. The committee is required to meet the technological need of rural hydropower development, gather experts' wisdom, act as the scientific and technological platform, follow the advanced scientific and technological achievements both at home and abroad. Let the technical innovation support and lead the healthy and sustainable development of the rural hydropower.

   Third, strengthen personnel training. In conformity with new requirements of rural hydropower development, a variety of personnel trainings should be conducted to help the whole rural hydropower staff know timely about the developing trend and the state of arts in this field, trace and enter the frontier of the science and technology. In addition, you should also actively engage in holding academic seminars and high-level technical exchange activity, substantially enhancing the extensity and intensity of members' participation in those activities.

   Fourth, enhance cooperation and exchange. We should bring the characteristics of cross-industry, cross-region, cross-sector and inter-discipline as well as technological and talent advantages of the committee into full play. Besides, we should establish wide contact with governments, enterprises, institutes, universities and related associations to conduct exchange and cooperation. It is likewise important to broaden channel to exchange and cooperate with our foreign counterparts to adopt the advanced technology and experience from foreign countries and at the same time introduce China's experience in SHP development to the foreign countries, push China's SHP technical products with its own intellectual property right to go global .

   Last but not least, under the guidance of the Scientific Outlook on Development and the leadership of China Society of Hydroelectric Engineering and the Ministry of Water Resources, SHP Special Committee is hoped to fully explore the wisdom and expertise of all the committee members ,boldly innovate and practise ,and make positive contributions to China's rural hydropower development.

   I wish it a great success. Thank you! (2008-12-24)

 

 

Copyright © HRC Secretariat All rights reserved