---On 10th of July, the Training Workshop
on Operation & Maintenance for Mongolian Taishir Power
Plant was opened and 12 operators from Mongolia will be
attending the 4-week training at HRC.
The electric-mechanic equipment of
the Plant has been designed by HRC's design institute
and the controling equipment of the Plant will be supplied
by HRC's R+D center. The plant will be put into commissioning
by the end of this year. (2007-07-13)