|
|
|
|
|
|
|
|
|
|
|
|
Fax:86
571 8806 2934 |
Phone:86
571 8808 6586 |
Address:122
Xueyuan Road, Hangzhou, China |
postcode:310012 |
[Email
us] |
|
|
Hydropower installed
capacity in rural areas increased by 1.88 GW last year
|
--- Ministry
of Water Resources of China disclosed recently that the
hydropower installed capacity in rural areas was increased
by 1.88 GW in 2002,the total hydropower installed capacity
of national water industry reached 37.83 GW, the annual
generating capacity was 118 billion kWh, among them the
hydropower installed capacity in rural areas reached 33
GW, the generating capacity was 108.4 billion kWh, accounting
for 39% of national hydropower installed capacity and 40%
of hydropower generating capacity respectively. The total
income of rural hydropower generation & supply in 2002
reached 46 billion yuan in 2002, the profit & tax were
8.1billion yuan, including 4.2 billion yuan of tax and 3.9
billion yuan of profit. At present, the hydropower installed
capacity in rural areas is equal to the hydropower installed
capacity in the late 1980s and the total installed capacity
of power industry in the early 1970s of the last century.
(Source: SHP
NEWS Editorial office)(2003-03-18)
|
|